English Version | contact@heat11.com
heat 11 | passion for heat transfer heat 11 | passion for heat transfer
  • Company
    • heat 11
    • Team
    • heat 11 manufacture
    • Piping systems manufacture and installation
    • Quality Management
    • Locations
    • Career
    • German Brand Award
    • Events
      • ACHEMA Pulse 2021
      • AchemAsia 2019
      • heatingdays
  • Products
    • Overview
    • Electric thermal oil heaters
    • Fired heaters / thermal oil boilers
    • Heating-cooling plants
    • Secondary loops
    • Waste heat recovery
    • Steam generators
    • Pump skids
    • Container plants
    • Plant engineering
  • Services
    • Services for thermal oil plants
    • Spare parts
    • Retrofittings and modifications
    • Plant service
  • Projects
    • Industry Overview
    • Applications for thermal oil plants
    • Project samples
    • Worldmap
  • Technology
    • Technology – thermal oil plants
    • Plant optimization
  • heatnews
  • Career
  • Contact
  • German
heat 11 | passion for heat transfer heat 11 | passion for heat transfer
  • Company
    • heat 11
    • Team
    • heat 11 manufacture
    • Piping systems manufacture and installation
    • Quality Management
    • Locations
    • Career
    • German Brand Award
    • Events
      • ACHEMA Pulse 2021
      • AchemAsia 2019
      • heatingdays
  • Products
    • Overview
    • Electric thermal oil heaters
    • Fired heaters / thermal oil boilers
    • Heating-cooling plants
    • Secondary loops
    • Waste heat recovery
    • Steam generators
    • Pump skids
    • Container plants
    • Plant engineering
  • Services
    • Services for thermal oil plants
    • Spare parts
    • Retrofittings and modifications
    • Plant service
  • Projects
    • Industry Overview
    • Applications for thermal oil plants
    • Project samples
    • Worldmap
  • Technology
    • Technology – thermal oil plants
    • Plant optimization
  • heatnews
  • Career
  • Contact
  • German
Jul 08

652 tons of CO2 per year saved with a hall roof

  • July 8, 2019
  • heat 11 manufacture, Press releases
  • gogreen, manufacture

Sandals, jute bags and felt sweaters were clichés of an »eco« yesterday. Today eco has become hip, because since »Fridays For Future« it is cool to take care of the climate. For some it is a meaningful lifestyle element, for heat 11 GmbH & Co. KG it is even one of the most important components of the company’s DNA and its own motivation.

That is why heat 11 GmbH & Co. KG followed its responsibility and its passion entirely selfless and out of pure conviction and can proudly report today on the completion of the installation of a photovoltaic system on the roof of the production hall heat 11 manufacture in Loehne.

At »heat 11 manufacture« photovoltaic elements with an output of 160 kW peak were installed. Per kWp of installed capacity, the plant generates approximately 800-950 kWh of electricity per year. If one calculates with 800 kWh generated electricity per year conservatively due to some rainy days in Ostwestfalen-Lippe, this results in an annual electricity production of 160 kWp x 800 kWh = 128,000 kWh for the 160 kW peak installed on the heat 11 hall.

Total performance:

160 kW peak

Peak performance:

800-950 kWh/year

Performance / year:

128.000 kWh

After heat 11 GmbH & Co. KG switched to resource-saving LED lighting in 2018, the production’s own electricity consumption amounts to only around 30,000 kWh per year. This means that the system generates almost the fourfold of its own electricity consumption. Or in other words: 75 %of the generated green electricity can also be supplied to other customers!

With an average electricity consumption of a 4-person household of some 3,500 kWh per year, the plant can supply about 36 households with electricity. And even after deduction of the own consumption still amount to 30!

The German »electricity mix« (nuclear energy, fossil-fired power plants and regenerative energies) must be based on CO2 emissions of 0.510 kg per kWh of electricity. The photovoltaic system installed on the heat 11 roof thus makes it possible to avoid 128,000 kWh x 0.51 kg = 652,800 kg = 652 tons of CO2 per year.

This represents a further step towards the ecologization and sustainability of the production in Loehne, where construction is currently being resumed on plants that will be used in large solar thermal power plants in order to generate even significantly more regenerative energy thereand to save tons of CO2 to an even greater extent. Thus heat 11 GmbH & Co. KG consistently continues its mission »GoGreen«.

Comments are closed.

Search

New Posts

  • Network, discover and innovate: Your heat 11 insights on LinkedIn
  • Electric heaters by heat 11: The future of efficient and sustainable energy generation
  • Innovative wasteheat recovery at the heart of the chemical industry: A heat 11 project report

Categories

  • Blog
  • Events
  • heat 11 manufacture
  • People
  • Press releases
  • Projects
  • Technology

Tags

Achema Anwendungen applications Befeuerte Erhitzer chemical industry Chemie customers efficiency increase Electric heater electric heaters energy efficiency explosion protection extruder heating fired heaters German Brand Award gogreen heat 11 heat 11 manufacture heat 11 TeamTour heat transfer fluid heat transfer plants Kunststoffindustrie maintenance molten salts plant concept plant engineering Plastic industry plastics industry projects Projekte quality solar process heat solar thermal power solar thermal power plants Solarthermische Kraftwerke South Africa tank farm heating team thermal oil boilers thermal oil heaters thermal oil plants thermal oil pumps thermo oil boilers Thermoölanlagen Winner

Links:

  • Home
  • Contact
  • Career
  • Media

New Posts

  • Network, discover and innovate: Your heat 11 insights on LinkedIn
  • Electric heaters by heat 11: The future of efficient and sustainable energy generation
  • Innovative wasteheat recovery at the heart of the chemical industry: A heat 11 project report

Subscribe our newsletter!

With our heatnewsletter we regularly inform you by e-mail about technical developments, exemplary projects as well as up-to-date news on the topic of process heat supply.
Subscribe now!
© 2014–2025 heat 11 GmbH & Co. KG
  • Imprint
  • Data Protection Statement
  • Disclaimer
  • Terms & Conditions of Purchase
  • Terms & Conditions of Sales and Service