On the road to Schwarzheide … Now the moment had come. The heavy haulage (dimensions of the vehicle: length = 21 m; width = 4.2 m; height = 4.5 m; total weight = 47.5 tons) could hit the road to its place of destination, the BASF location Schwarzheide... read more →
Jun
12
Jun
09
The remarkable... read more →
Apr
24
One of the world’s largest plastics, chemical and refining companies, is constructing a plant for the production of polyethylene with particularly high density (HDPE = „High Density Polyethylene“) and an annual total capacity of 500 000 tons with the help of heat 11 GmbH & Co. KG on the... read more →
Feb
25
Whenever individual plants or... read more →
Feb
21
Social equity and environmental sustainability 25 km east of the South African city of Upington, the 100 MW parabolic trough solar power plant »Ilanga CSP 1 / Karashoek Solar One« is being built by order of the project development company »Ilangalethu Solar Power« with the help of heat... read more →
Feb
03
The Bielefeld specialist for industrial process heat, heat transfer and energy conversion heat 11 (Germany) has successfully passed an extensive quality audit of the Stuttgart company COPERION. Since the beginning of 2011 on the market, heat 11 completed an audit of the important customer COPERION from Stuttgart (Germany) at... read more →
Jan
12
Since the beginning of November preparations were undertaken. Now the preparatory measures have been mostly completed at the production location in Löhne/Germany and heat 11 starts the work in the about 2200 m² large and best equipped hall just in... read more →
Nov
22
Although the year is not yet over, one thing is already certain that heat 11 will write the best business year in its almost six-year history. Besides the »Lighthouse Projects« such as a diphyl flash plant for HOSAF in South Africa with two thermal oil boilers of 12 MW... read more →
Nov
22
At the beginning of November the starting signal was given: heat 11 establish its own production facility near the head office in Bielefeld. At the moment, the preparations are in full swing as the start of the manufacturing plant is scheduled for the beginning of the new year. »With... read more →
Nov
17
Almost throughout his entire life Norbert Klocke has been engaged in heat transfer systems whether these are waste heat recovery units with hot water/steam or with thermal oil: After a training as machine fitter followed by studies in mechanical engineering, Norbert Klocke had been working for the Bielefeld engineering... read more →